Hotels and guest houses: how it works

The manager’s screen, housekeeping, engineering, the front desk and every crew phone are one system. Requests land in one place, the right person is suggested, and the manager only decides what needs a person. Click around, or press Play the tour. Made-up data.

Hotel Las Flores · Operations Sample data

Thursday · Today

Good morning.

Today’s plan was built overnight: 26 tasks, in checkout and walking order.

Needs your decision 3 waiting2 waiting

UrgentRoom 104 · Engineering

Mini-fridge not cooling

The guest keeps medication in it. Reported by the front desk, 7:42.

Suggested: Mateo R., on shift and two minutes away.

Approved. On Mateo’s phone now.

Mateo started at 7:49. He is on it.

Fixed at 8:14, with a photo.

TodayRoom 205 · Front desk

Late checkout until 1 PM

No arrival in 205 tonight. Housekeeping can take it last.

Approved. Housekeeping route updated.

PreventivePool · Engineering

Pool pump pressure low

From the daily check. Still inside the safe range.

On tomorrow’s plan.

Today’s plan Built overnight

Housekeeping19
Engineering5
Front desk2

AssistantEnglish · Español

Room 305 has an early check-in at 12 and is not clean yet. Move it to the top of Camila’s route?

Done. Room 305 is first on Camila’s route.

Mateo R. · IngenieríaEngineering

Hoy, 3 tareasToday, 3 tasks

Nada urgente por ahora.Nothing urgent right now.

Hab. 104 · Mini-refriRoom 104 · Mini-fridge Hecho 8:14 · con fotoDone 8:14 · with photo

Lucía G. · Planta 1Floor 1

Hoy, 6 habitacionesToday, 6 rooms

105InspeccionadaInspected

107Salida · en cursoDeparture · in progress

107Lista para inspecciónReady to inspect
101Salida · después de las 11Departure · after 11
102ServicioStayover
104ServicioStayover
106ServicioStayover

Try it Click anything on the screen or the phone. Each part says what it does.

A guest reports a problem. It is approved, fixed and on the record.

Your day before

  • Requests arrive by phone, radio, text and sticky note.
  • You hear a job was missed when the guest complains at checkout.
  • The day’s plan lives in one person’s head.

Your day after

  • Every request lands in one list, with the right person suggested.
  • You approve with one tap, and the engineer’s phone gets the job.
  • Each fix closes with a photo and stays in the room’s history.

What each part does

Today
The manager’s morning view: the day in four numbers and the few decisions that need a person.
Approvals
Approve a work order and the engineer’s phone gets it, with the room, the note and a time limit.
Rooms
Every room’s status by floor, with the guest, housekeeping, open work and history.
Housekeeping
Routes built overnight from checkout times, workload and walking distance. A failed inspection sends the room back for a re-clean.
Engineering
Work orders with time limits and escalation, and preventive checks created every night.
Front desk
Arrivals, departures and requests like an early check-in, sent to housekeeping in one tap.
Assistant
Prepares a change for a person to confirm, and every change can be undone for 10 minutes.
Crew phones
In Spanish or English, with each step, a checklist and a photo at the end.